Difference between revisions of "Project plan"

From Superoptimization
Jump to: navigation, search
m (Work packages)
m (Work packages)
 
Line 10: Line 10:
  
 
With the exception of the intermedite report for WP4, no intermediate milestones are provided, since each work package is small. The initial plan shows end dates of 19 Sep 14, to allow two weeks continency within this 4 month project. There are five work packages:
 
With the exception of the intermedite report for WP4, no intermediate milestones are provided, since each work package is small. The initial plan shows end dates of 19 Sep 14, to allow two weeks continency within this 4 month project. There are five work packages:
# [[Work package 1|Establish scope for superoptimization]]
+
# [[Work Package 1|Establish scope for superoptimization]]
# [[Work package 2|Design a candidate solution or solutions]]
+
# [[Work Package 2|Design a candidate solution or solutions]]
# [[Work package 3|Evaluate the potential solutions]]
+
# [[Work Package 3|Evaluate the potential solutions]]
# [[Work package 4|Document the design and propose a path to implementation]]
+
# [[Work Package 4|Document the design and propose a path to implementation]]
# [[Work package 5|Construct an early stage business plan for exploitation]]
+
# [[Work Package 5|Construct an early stage business plan for exploitation]]
  
 
== Risk register ==
 
== Risk register ==
  
 
A risk register of risks and their mitigation is provided on the [[risk analysis]] page.
 
A risk register of risks and their mitigation is provided on the [[risk analysis]] page.

Latest revision as of 18:57, 1 August 2014

Overview

This study will develop a proof of concept superoptimizer that considers all features of a modern processor as the basis for a developing a future commerical offering.

Project management

Weekly meetings between the lead engineer and project manager. These will alternate between phone conferences and face-to-face meetings in Lymington and Bristol.

Work packages

With the exception of the intermedite report for WP4, no intermediate milestones are provided, since each work package is small. The initial plan shows end dates of 19 Sep 14, to allow two weeks continency within this 4 month project. There are five work packages:

  1. Establish scope for superoptimization
  2. Design a candidate solution or solutions
  3. Evaluate the potential solutions
  4. Document the design and propose a path to implementation
  5. Construct an early stage business plan for exploitation

Risk register

A risk register of risks and their mitigation is provided on the risk analysis page.