Difference between revisions of "Work Package 3"
From Superoptimization
m (→Work package summary) |
(→Work package summary: Updated for interim report) |
||
Line 7: | Line 7: | ||
| ''End date:'' || 15 August 2014 | | ''End date:'' || 15 August 2014 | ||
|} | |} | ||
+ | |||
+ | Revised, since [[Work Package 2|work package 2]] has implemented prototypes for the various superoptimization techniques. | ||
=== Description === | === Description === | ||
− | + | Measure the benefit to be achieved from superoptimization, using the [[Work Package 2|work package 2]] prototypes. | |
=== Deliverables === | === Deliverables === | ||
− | A report on the findings of these | + | A report on the findings of these measurements. |
=== Dependencies === | === Dependencies === |
Revision as of 10:07, 8 August 2014
Contents
Work package summary
Start date: | 21 July 2014 |
End date: | 15 August 2014 |
Revised, since work package 2 has implemented prototypes for the various superoptimization techniques.
Description
Measure the benefit to be achieved from superoptimization, using the work package 2 prototypes.
Deliverables
A report on the findings of these measurements.
Dependencies
work package 1 and work package 2, although likely to be done in parallel
Approach
Hand-calculate benefit from superoptimization, comparing the different techniques. Stretch goal measure implementation (if WP2 completed an implementation).
Notes
The benefit is likely to be largest for inner loops, and frequently executed portions of code.
A prototype superoptimizer has been constructed, to allow short AVR instruction sequences to be evaluated.
Deliverables
Available soon