Difference between revisions of "Work Package 4"
(→Deliverables) |
(→Work package summary) |
||
Line 20: | Line 20: | ||
=== Dependencies === | === Dependencies === | ||
− | + | Ran concurrently with [[Work Package 1|work package 1]], [[Work Package 2|work package 2]] and [[Work Package 3|work package 3]]. | |
=== Status === | === Status === | ||
− | + | Complete. | |
== Approach == | == Approach == |
Revision as of 16:07, 20 October 2014
Contents
Work package summary
Start date: | 2 June 2014 |
End date: | 19 September 2014 |
Revised, since the deliverable of work package 2 forms an appropriate interim report.
Description
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.
Deliverables
A report as described, with the deliverable of work package 2 forming the interim report, to be delivered by 25 July 2014.
Dependencies
Ran concurrently with work package 1, work package 2 and work package 3.
Status
Complete.
Approach
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
Notes
This will provide an extended version of the WP2 deliverable.
Deliverables
Available: Final report