Difference between revisions of "Work Package 4"
(→Deliverables) |
(→Deliverables) |
||
Line 16: | Line 16: | ||
=== Deliverables === | === Deliverables === | ||
− | A report as described, with the deliverable of [[Work Package 2|work package 2]] | + | A report as described, with the deliverable of [[Work Package 2|work package 2]] formed the interim report, and was delivered on 1 August 2014. |
+ | |||
+ | The [[final report|final technical report]] was delivered on 30 September 2014. | ||
=== Dependencies === | === Dependencies === |
Revision as of 16:09, 20 October 2014
Contents
Work package summary
Start date: | 2 June 2014 |
End date: | 19 September 2014 |
Revised, since the deliverable of work package 2 forms an appropriate interim report.
Description
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.
Deliverables
A report as described, with the deliverable of work package 2 formed the interim report, and was delivered on 1 August 2014.
The final technical report was delivered on 30 September 2014.
Dependencies
Ran concurrently with work package 1, work package 2 and work package 3.
Status
Complete.
Approach
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
Notes
This will provide an extended version of the WP2 deliverable.
Deliverables
Available: final technical report