Difference between revisions of "Work Package 4"
(→Deliverables) |
(→Notes) |
||
Line 31: | Line 31: | ||
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3. | Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3. | ||
== Notes == | == Notes == | ||
− | This | + | |
+ | This provided an extended version of the WP2 deliverable. | ||
== Deliverables == | == Deliverables == | ||
Available: [[Final report|final technical report]] | Available: [[Final report|final technical report]] |
Latest revision as of 16:09, 20 October 2014
Contents
Work package summary
Start date: | 2 June 2014 |
End date: | 19 September 2014 |
Revised, since the deliverable of work package 2 forms an appropriate interim report.
Description
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.
Deliverables
A report as described, with the deliverable of work package 2 formed the interim report, and was delivered on 1 August 2014.
The final technical report was delivered on 30 September 2014.
Dependencies
Ran concurrently with work package 1, work package 2 and work package 3.
Status
Complete.
Approach
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
Notes
This provided an extended version of the WP2 deliverable.
Deliverables
Available: final technical report