== Description ==
+
== Work package summary ==
 +
 
 +
{|
 +
|-
 +
| ''Start date:'' || 2 June 2014
 +
|-
 +
| ''End date:''  || 19 September 14
 +
|}
 +
 
 +
=== Description ===
 +
 
 +
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in [[Work Package 1|work package 1]],[[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
 +
 
 +
=== Deliverables ===
 +
 
 +
A report as described, with an interim version delivered by 25 Jul 14.
 +
 
 +
=== Dependencies ===
 +
 
 +
Runs concurrently with [[Work Package 1|work package 1]],[[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
 +
 
 +
== Approach ==
 
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
 
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
 
== Notes ==
 
== Notes ==

Revision as of 09:59, 8 August 2014

Work package summary

Start date: 2 June 2014
End date: 19 September 14

Description

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1,work package 2 and work package 3.

Deliverables

A report as described, with an interim version delivered by 25 Jul 14.

Dependencies

Runs concurrently with work package 1,work package 2 and work package 3.

Approach

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.

Notes

This will provide an extended version of the WP2 deliverable.

Deliverables

Completed by the end of the project