Work Package 4
Contents
Work package summary
Start date: | 2 June 2014 |
End date: | 19 September 2014 |
Description
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1,work package 2 and work package 3.
Deliverables
A report as described, with an interim version delivered by 25 Jul 14.
Dependencies
Runs concurrently with work package 1,work package 2 and work package 3.
Approach
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.
Notes
This will provide an extended version of the WP2 deliverable.
Deliverables
Completed by the end of the project