Difference between revisions of "Work Package 4"

From Superoptimization
Jump to: navigation, search
m (Deliverables)
(Work package summary)
Line 7: Line 7:
 
| ''End date:''  || 19 September 2014
 
| ''End date:''  || 19 September 2014
 
|}
 
|}
 +
 +
Revised, since the deliverable of [[Work Package 2|work package 2]] forms an appropriate interim report.
  
 
=== Description ===
 
=== Description ===
Line 14: Line 16:
 
=== Deliverables ===
 
=== Deliverables ===
  
A report as described, with an interim version delivered by 25 July 2014.
+
A report as described, with the deliverable of [[Work Package 2|work package 2]] forming the interim report, to be delivered by 25 July 2014.
  
 
=== Dependencies ===
 
=== Dependencies ===

Revision as of 10:08, 8 August 2014

Work package summary

Start date: 2 June 2014
End date: 19 September 2014

Revised, since the deliverable of work package 2 forms an appropriate interim report.

Description

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1,work package 2 and work package 3.

Deliverables

A report as described, with the deliverable of work package 2 forming the interim report, to be delivered by 25 July 2014.

Dependencies

Runs concurrently with work package 1,work package 2 and work package 3.

Approach

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.

Notes

This will provide an extended version of the WP2 deliverable.

Deliverables

Completed by the end of the project