Difference between revisions of "Work Package 4"

From Superoptimization
Jump to: navigation, search
(Work package summary)
(Work package summary: Added status)
Line 12: Line 12:
 
=== Description ===
 
=== Description ===
  
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in [[Work Package 1|work package 1]],[[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
+
Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in [[Work Package 1|work package 1]], [[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
  
 
=== Deliverables ===
 
=== Deliverables ===
Line 20: Line 20:
 
=== Dependencies ===
 
=== Dependencies ===
  
Runs concurrently with [[Work Package 1|work package 1]],[[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
+
Runs concurrently with [[Work Package 1|work package 1]], [[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
 +
 
 +
=== Status ===
 +
 
 +
In progress. Interim report (deliverable of [[Work Package 2|work package 2]]) complete.
  
 
== Approach ==
 
== Approach ==

Revision as of 10:11, 8 August 2014

Work package summary

Start date: 2 June 2014
End date: 19 September 2014

Revised, since the deliverable of work package 2 forms an appropriate interim report.

Description

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.

Deliverables

A report as described, with the deliverable of work package 2 forming the interim report, to be delivered by 25 July 2014.

Dependencies

Runs concurrently with work package 1, work package 2 and work package 3.

Status

In progress. Interim report (deliverable of work package 2) complete.

Approach

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.

Notes

This will provide an extended version of the WP2 deliverable.

Deliverables

Completed by the end of the project