Difference between revisions of "Work Package 4"

From Superoptimization
Jump to: navigation, search
(Deliverables)
(Work package summary)
Line 20: Line 20:
 
=== Dependencies ===
 
=== Dependencies ===
  
Runs concurrently with [[Work Package 1|work package 1]], [[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
+
Ran concurrently with [[Work Package 1|work package 1]], [[Work Package 2|work package 2]] and [[Work Package 3|work package 3]].
  
 
=== Status ===
 
=== Status ===
  
In progress. Interim report (deliverable of [[Work Package 2|work package 2]]) complete.
+
Complete.
  
 
== Approach ==
 
== Approach ==

Revision as of 16:07, 20 October 2014

Work package summary

Start date: 2 June 2014
End date: 19 September 2014

Revised, since the deliverable of work package 2 forms an appropriate interim report.

Description

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.

Deliverables

A report as described, with the deliverable of work package 2 forming the interim report, to be delivered by 25 July 2014.

Dependencies

Ran concurrently with work package 1, work package 2 and work package 3.

Status

Complete.

Approach

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.

Notes

This will provide an extended version of the WP2 deliverable.

Deliverables

Available: Final report