Work Package 4

From Superoptimization
Jump to: navigation, search

Work package summary

Start date: 2 June 2014
End date: 19 September 2014

Revised, since the deliverable of work package 2 forms an appropriate interim report.

Description

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in work package 1, work package 2 and work package 3.

Deliverables

A report as described, with the deliverable of work package 2 formed the interim report, and was delivered on 1 August 2014.

The final technical report was delivered on 30 September 2014.

Dependencies

Ran concurrently with work package 1, work package 2 and work package 3.

Status

Complete.

Approach

Document the generalized process to demonstrate repeatability. This is the main engineering documentation of the project, and should provide sufficient information to guide a future product implementation. This will include appropriate reference to the work in WP1, WP2 and WP3.

Notes

This provided an extended version of the WP2 deliverable.

Deliverables

Available: final technical report